Installation
CONCRETE BASINS
Below are the recommended installation steps for your plumber to follow:
- Carefully clean both underneath the basin and benchtop.
- Apply clear silicon around the bottom of the basin and around the waste hole. Place the basin in position making sure to align the waste hole. Press the basin down onto the bench top.
- Apply clear silicon around the base of the basin where it meets the bench top. Clean off the excess.
- Apply clear silicon around the waste hole to create a watertight seal inside your basin. Fit waste evenly into position. Clean off the excess.
- Tighten waste into place until hand tight. Do not over tighten.
- Wait at least 24 hours for the silicon to dry before water testing.
All products come with a complete Installation Guide.